Hands-on classes are opening state by state. Get a text when yours opens →

Equipment and supplies

Epoxy flooring starter kit: what to buy first, in three budgets

What an epoxy flooring starter kit costs: three budgets built from published prices, what suppliers' starter kits contain, and what to add as work grows.

Low-angle close-up of black, white and gray flake in a garage workshop with wall-hung tools
Close-up: silver flake in a garage workshop More floors

Key takeaways

  • Rent first: own the application kit, an edge grinder kit, respirators and moisture tests for about $872–1,248, and rent the floor grinder and extractor for about $315–367 per job.
  • Buy the basics: add your own HEPA extractor and the owned kit comes to about $2,772–3,648 with a compact extractor, or $4,272–5,148 with one big enough for a 7-inch edge grinder; only the grinder is rented.
  • Full kit: owning a 22-inch dual-disc grinder, tooling, a larger extractor and an enclosed trailer takes the total to about $16,405–19,166, before materials, insurance and training.
  • Supplier tool kits cost about $170–280, full-flake material kits start around $900 for a 400 sq ft floor, and grinder-and-vacuum packages run about $12,000–13,000.
  • No kit includes everything: moisture tests, PPE, insurance and training are separate line items.

A realistic epoxy flooring starter kit costs about $872–1,248 if you rent the floor grinder and dust extractor, about $2,772–3,648 if you also own the extractor, and about $16,405–19,166 if you buy everything, including a 22-inch dual-disc grinder and a trailer. The arithmetic is below, line by line. Materials, insurance and training come on top.

Below are the three budgets, what suppliers’ “starter kits” actually contain, how to judge one, and what to add as the work grows. The full equipment list, stage by stage, is in epoxy flooring equipment; to total your own setup including insurance and training, use the startup cost calculator.

Budget 1: rent first

You own what you use on every job and rent the expensive prep machines job by job.

Owned item Price
Application tool kit (squeegees, rollers, frames, mixer, spiked shoes) About $150–320
Edge grinder kit (7” grinder, dust shroud, cup wheel) About $640–716
Two respirators, organic vapor with particulate filters 2 × $23–52 = $46–104
Three calcium chloride moisture tests (one floor up to 1,000 sq ft) 3 × $12–36 = $36–108
Owned total $150 + $640 + $46 + $36 = $872 to $320 + $716 + $104 + $108 = $1,248
Rented per job Rate
22” dual-disc grinder, one day About $90–142
HEPA dust extractor, one week About $225
Rent per job $90 + $225 = $315 to $142 + $225 = $367, plus tooling

This is the budget for your first jobs: the least cash at risk while you learn which work you’ll get. Rental shops usually bill diamond tooling separately; see the concrete grinder rental guide.

A first month on Budget 1

Say you book three garage jobs in your first month, each under 1,000 sq ft:

Line Cost
Owned kit, bought once (includes tests for the first floor) $872–1,248
Moisture tests for the other two floors 2 × 3 × $12–36 = $72–216
Rent for three jobs 3 × $315–367 = $945–1,101
Equipment cash out for the month $872 + $72 + $945 = $1,889 to $1,248 + $216 + $1,101 = $2,565

Tooling and materials come on top, and both belong in each job’s price, not in your startup budget.

Budget 2: buy the basics

Same owned kit, plus your own extractor, so you only rent the grinder.

Item Price
Budget 1 owned kit $872–1,248
HEPA dust extractor, DE 110 class About $1,900–2,400
Owned total $872 + $1,900 = $2,772 to $1,248 + $2,400 = $3,648
Rent per job Grinder only: about $90–142 a day

The extractor comes first because, rented by the week, it pays back fastest: $1,900–2,400 ÷ $225 a week is about 8–11 weeks of rental. The rent vs buy guide works through the payback for each machine.

Size it to your tools before you buy. Under OSHA’s silica rules, a hand grinder’s dust collector needs at least 25 cfm of airflow per inch of wheel, so 7 × 25 = 175 cfm for the 7-inch edge grinder in this kit, and a floor grinder needs the airflow its maker recommends. Compact DE 110-class units are rated around 124 cfm; DE 120-class units, around 241 cfm, clear 175. If one extractor will serve your edge grinder too, price the larger class: $872 + $3,400 = $4,272 to $1,248 + $3,900 = $5,148 owned. Dust extractors and OSHA’s silica rules covers the filter requirements.

Budget 3: the full kit

Everything owned, for a business grinding most weeks.

Item Price
Budget 1 owned kit $872–1,248
22” dual-disc grinder (EDCO 2EC-NG, 3 hp, 230V) $8,488
One set of diamond tooling About $195–530
HEPA dust extractor, DE 120 class About $3,400–3,900
Enclosed 6×12 trailer About $3,450–5,000
Owned total $872 + $8,488 + $195 + $3,400 + $3,450 = $16,405 to $1,248 + $8,488 + $530 + $3,900 + $5,000 = $19,166

Owning adds running costs: tools and equipment insurance for flooring installers runs about $41 a month (median), and a trailer needs a vehicle that can tow it.

Not in any of the budgets

  • Materials. About $1–5 per sq ft of an installed epoxy floor; usually bought per job, or billed to the customer up front.
  • Insurance. General liability for flooring installers runs about $77 a month (median).
  • More insurance as you grow. Commercial auto runs about $208 a month and workers’ compensation about $144 a month (medians for flooring installers) once you put a vehicle to work for the business or hire help.
  • Training, LLC fees and marketing. Covered in how to start an epoxy flooring business.
  • Small items. Mixing buckets, tape, plastic, chip brushes, gloves, coveralls, a thermometer and hygrometer, a laser measure.

What suppliers’ “starter kits” contain

“Starter kit” means three different things depending on who’s selling. Examples from coating supply houses, at 2026 prices, not endorsements:

Application tool kits

  • One Stop Epoxy full-flake tool kit, up to 400 sq ft, $279.99: two 18-inch rollers, a 1/8-inch notched squeegee, a heavy-duty roller frame, a cage mixer, a flat squeegee, spiked shoes, two 9-inch rollers and a frame, two chip brushes, a scraper and a painter’s pole.
  • One Stop Epoxy metallic tool kit, 0–300 sq ft, $169.99: a 1/8-inch notched squeegee, two 18-inch rollers, a trowel for metallic effects, a roller frame, a cage mixer, spiked shoes, two 9-inch rollers and chip brushes.
  • Epoxy Plus installation tool kit, $199.95: three 18-inch 3/8-inch roller covers, a roller frame, a 4-inch roller frame and three covers, an 18-inch flat squeegee, a mixing paddle and two pairs of spiked shoes.

Material kits

Full-flake floor kits are sized by area. One Stop Epoxy’s run $899 for up to 400 sq ft and $1,299 for 401–600 sq ft, each with a 100%-solids self-leveling epoxy base, full-broadcast vinyl flake and a polyaspartic clear topcoat; primer, moisture barrier, crack repair, anti-slip additive and tool kits are add-ons. That’s $899 ÷ 400 = $2.25 per sq ft on a full 400 sq ft floor. The supplies guide covers buying materials by the system instead.

Grinder and vacuum packages

  • XPS Concrete Genie surface prep package, $11,999: a Concrete Genie floor grinder ($7,995 on its own), a Tromb 400L dust vacuum ($3,399), a microfiber squeegee kit, a Mohs hardness kit, 16- and 30-grit medium-bond trapezoid segments and PCD wheels. XPS sells it as a starter package.
  • One Stop Epoxy Grizzly surface prep package, $12,995: a grinder, a vacuum and three sets of nine diamonds in soft, medium and hard bonds; in-store pickup, with shipping extra.

For comparison, the grinder, one tooling set and an extractor priced separately above add up to $8,488 + $195 + $1,900 = $10,583 to $8,488 + $530 + $3,900 = $12,918. The packages bundle different machines, so compare specifications, not just totals.

How to judge a kit

  • Does it fit the system you'll install? Flake, metallic and polyaspartic jobs use different squeegees and rollers.
  • Is it sized for your floors? Kits are labeled by square footage; one kit per job, or reusable tools?
  • Grinder specs. Width, weight, voltage and amperage, and the tooling attachment it takes.
  • Extractor specs. Airflow and filter rating, against OSHA's silica requirements; see dust extractors and OSHA's silica rules.
  • Tooling. Which bonds and grits, and are they right for your local concrete?
  • What's missing. Moisture tests, PPE, buckets, tape and solvent are rarely included.
  • Support. Who services the machine, and how fast can you get parts?

Skip home-center garage kits for customer work. Do-it-yourself epoxy paints are often water-based, and some are light-duty latex paint with a little epoxy resin added: not the 100%-solids systems with data sheets your warranty will rest on.

What to add later

  • Your own floor grinder, once you grind most weeks; the rent-vs-buy calculator shows when.
  • A second tooling set in a different bond, and PCDs if you remove old coatings.
  • A trailer when rental pickups start costing you jobs.
  • A planetary grinder or shot blaster only when you’re bidding floors that need them.
  • Extra spiked shoes, squeegees and roller frames as the crew grows.

Equipment is only part of the plan. The kit gets you on the floor; knowing how to use it and what to charge gets you paid. In The Epoxy Playbook you watch the full installation, replay any step as often as you need, then do it on the slab in a hands-on class. Run your full startup numbers in the startup cost calculator.

Questions

What's in an epoxy flooring starter kit?

It depends on who's selling it. Tool kits contain the application tools: squeegees, rollers and frames, a mixer, spiked shoes, chip brushes and a scraper. Material kits contain the coatings for a set floor size, such as a 100%-solids epoxy base, flake and a polyaspartic topcoat. Equipment packages pair a floor grinder with a dust extractor and diamond tooling. A business needs some of each.

How much does it cost to get started with epoxy flooring equipment?

Renting the grinder and extractor and owning the hand tools comes to about $872–1,248 in owned equipment plus about $315–367 of rent per job. Owning everything, including an $8,488 dual-disc grinder, a larger extractor and a trailer, is about $16,405–19,166. Materials, insurance and training are on top; the startup cost calculator adds them up.

Are supplier equipment packages worth it?

Compare them line by line. A package can save money and match the grinder to its vacuum, but check the grinder's size, weight and voltage, the tooling system it uses, which tooling bonds are included, and whether the extractor's airflow and filter meet OSHA's silica requirements. Grinder-and-vacuum packages run about $12,000–13,000.

Can I start with a home-center epoxy garage kit?

Not for customer work. Home-center epoxy paints are often water-based, and some are mostly light-duty latex paint with a little epoxy resin. Professional systems are typically 100%-solids epoxies and polyaspartics with data sheets that specify prep, thickness, moisture limits and cure, which is what a warranty depends on.

What should I buy first?

The things you use on every job and that cost little: the application tool kit, an edge grinder kit with a dust shroud, respirators and other PPE, moisture test kits, and a thermometer and hygrometer. Rent the floor grinder and extractor until you grind most weeks, then buy the extractor first, sized for your edge grinder; it pays back fastest.

Start with the numbers

Grinder rent or buy, dust extractor, tools, insurance, training and first materials, in one estimate.

Open the startup cost calculator