Free tool

Epoxy coverage calculator

How much epoxy to buy for a floor: kits and gallons for every coat, and what they cost. Answer two quick questions; mils, solids and kit sizes are already filled in, and you can fine-tune them.

White high-gloss floor in an aircraft hangar with a framed mezzanine under construction
White high-gloss coating, aircraft hangar More floors
Two quick questions

or length×ft

2. Which system are you installing?

Fine-tune the numbers (optional)

The calculator already works with these typical values. Copy your own products' numbers from their data sheets: film thickness or spread rate, volume solids, kit size and price.

Typical: 3–8 mils of a 100% solids primer, sold in 1.5-gal kits

  • Spread rate—
  • Wet film—
  • Dry film—
  • Gallons needed—
  • Kits—
  • Cost—

Typical: 8–12 mils under flake, 10–30 mils for solid color; 100% solids, 3-gal kits

  • Spread rate—
  • Wet film—
  • Dry film—
  • Gallons needed—
  • Kits—
  • Cost—

Double broadcast only: typically 12–16 mils

  • Spread rate—
  • Wet film—
  • Dry film—
  • Gallons needed—
  • Kits—
  • Cost—

Typical over flake: 100–160 sq ft per gallon of a 90–93% solids polyaspartic, 2-gal kits

  • Spread rate—
  • Wet film—
  • Dry film—
  • Gallons needed—
  • Kits—
  • Cost—
Allowances

Text me these results

Optional. We'll text you the kits and gallons for each coat. The calculator works without it.

The formula

Epoxy floor coverage: how the calculator works

Coverage is worked out the same way across the coatings industry. A US gallon is 231 cubic inches; spread 1 mil (0.001 inch) thick, it covers 1,604 sq ft. Only the solids stay on the floor, so:

  • Spread rate (sq ft per gallon) = 1,604 × volume solids ÷ dry film thickness (mils).
  • Wet film thickness = dry film thickness ÷ volume solids, which is the same as 1,604 ÷ spread rate.
  • Gallons = area ÷ spread rate, plus the first-coat allowance on the first coat, plus waste.
  • Kits = gallons ÷ kit size, rounded up for each coat. Two-part products should be mixed as full kits, so the calculator never splits one.

Worked example: a 400 sq ft flake floor

  • Primer, 100% solids at 4 mils: 1,604 ÷ 4 = 401 sq ft per gallon. 400 ÷ 401 = 1.00 gal, × 1.10 first-coat allowance × 1.10 waste = 1.21 gal: one 1.5-gal kit, $123.75.
  • Base coat, 100% solids at 10 mils: 160.4 sq ft per gallon. 400 ÷ 160.4 = 2.49 gal × 1.10 = 2.74 gal: one 3-gal kit, $159.
  • Polyaspartic topcoat at 130 sq ft per gallon: 400 ÷ 130 = 3.08 gal × 1.10 = 3.38 gal: two 2-gal kits, $411. At 91.5% solids that leaves about 11.3 dry mils.
  • Total: 7.3 gal needed, 8.5 gal bought in 4 kits, $693.75, or $1.73 a square foot before flake.

The formula gives theoretical coverage on a smooth surface with nothing lost. Real coverage depends on the slab's profile and porosity, how the coat is applied, the crew and the weather, which is what the waste and first-coat lines are for: raise them for rough or very thirsty slabs.

Use the data sheet for your product. Volume solids, the film thickness range and the kit size are all on the technical data sheet; when a rule of thumb and the data sheet disagree, follow the data sheet. Every term is explained in the glossary.

The three systems

SystemCoats (typical)
Standard garage flakePrimer 3–8 mils · base coat 8–12 mils with a full flake broadcast · clear topcoat at 100–160 sq ft per gallon
Heavier double broadcastAs above, plus a second base coat of 12–16 mils and a second broadcast before the topcoat
Solid-color epoxyPrimer 3–8 mils · one body coat of 10–30 mils; a topcoat is optional

The calculator uses the middle of each range. Flake quantities come from the flake calculator.

100% solids: spread rate by thickness

Theoretical square feet per gallon for a 100% solids coating at each thickness
Film thicknessSq ft per gallonGallons per 400 sq ft
3 mils534.70.75
4 mils401.01.00
5 mils320.81.25
8 mils200.52.00
10 mils160.42.49
12 mils133.72.99
16 mils100.33.99
20 mils80.24.99
30 mils53.57.48
40 mils40.19.98

Theoretical, before waste: 1,604 ÷ mils. Multiply by the volume solids for products under 100% solids.

Defaults

How we set the defaults

InputDefaultWhy
Floor size400 sq ftAn example: a 20 × 20 ft garage. Enter your own floor.
Primer4 mils, 1.5 gal, $123.75A tight, thin coat inside the typical 3–8 mils of a 100% solids primer, at a typical listed price for a 1.5-gallon kit.
Base coat10 mils, 3 gal, $159The middle of the typical 8–12 mils under flake (20 mils for solid color, the middle of 10–30), at a typical price for a 3-gallon kit of 100% solids epoxy.
Second base coat14 milsThe middle of the typical 12–16 mils for a double broadcast. Off for the other systems.
Topcoat130 sq ft/gal, 91.5%, 2 gal, $205.50The middle of the typical 100–160 sq ft per gallon over a full broadcast and 90–93% solids for a polyaspartic, at a typical price for a 2-gallon kit.
Waste10%An allowance for material left in buckets and on tools. Change it to match your jobs.
Extra for the first coat10%An allowance for bare concrete soaking up the first coat. Raise it for porous or heavily profiled slabs.

Prices vary by brand and supplier and change over time; use your own.

Questions

Epoxy coverage: frequently asked questions

How do you calculate epoxy coverage?

Divide 1,604 by the dry film thickness in mils and multiply by the volume solids: that is the theoretical square feet per gallon. Divide the floor area by it to get gallons, then add waste and round up to whole kits. A 100% solids epoxy at 10 mils covers 1,604 × 1.00 ÷ 10 = 160 sq ft per gallon.

How many square feet does a gallon of epoxy cover?

A gallon of 100% solids epoxy covers about 1,604 sq ft at 1 mil, so about 160 sq ft at 10 mils and 80 sq ft at 20 mils, before waste. A product with lower volume solids covers less at the same dry thickness, and porous or rough concrete takes more.

How much epoxy do I need for a two-car garage?

For a 400 sq ft floor with the standard garage flake system (primer, base coat, flake and a clear topcoat), about 7.3 gallons of coating: one 1.5-gallon primer kit, one 3-gallon base coat kit and two 2-gallon topcoat kits, including 10% waste and 10% extra on the first coat.

What is the difference between wet and dry film thickness?

Wet film thickness is what you spread; dry film thickness is what is left once any solvent or water has gone. Dry = wet × volume solids, so for a 100% solids epoxy they are the same, and a 90% solids coating needs about 11 wet mils to leave 10 dry.

Why does the first coat on bare concrete take more material?

Freshly ground concrete is porous and soaks up part of the first coat, which is why primer spread rates are given as wide ranges. The calculator adds 10% to the first coat by default; you can change it under “Fine-tune the numbers”.

Watch every step before you do it

The Epoxy Playbook: full installations recorded start to finish, which you can replay as often as you need, plus pricing, quoting and selling the job.

See what the Playbook covers